
Projects
Which sites we look at, and by what standard
What we check for each type, and when we tell you not to build. Published as-is.
GRIDAEND applies a different set of checks to each site type — ground-mount, rooftop, carport, BIPV, ESS, and VPP — and says up front which conditions leave a project unworkable.
Site types
Every type breaks at a different point
What sinks a ground-mount project is not what sinks a rooftop one.
Here is what we check for each type.
Here is what we check for each type.
Our partners
For investors
Looking for sites that have already been assessed?
We connect investors and power producers to sites where permitting, grid connection, and returns have been checked. Tell us the size, the region, and the terms you are after. When a site that fits comes in, we come back to you.
Free assessment
The assessment starts with one line: the site address
Leave the address and a contact number. Within about five business days we send back the initial feasibility assessment as a report.
Where a site works, that report also sets out competitive EPC bids and financing terms.
Available to landowners, building owners, or their authorized representatives · Results come back as a report
