Glossary
Solar glossary
The 24 terms that come up again and again in a solar project, defined in plain language.
SMP
System Marginal PriceThe wholesale price of one kWh, set hour by hour on the Korea Power Exchange wholesale market. It is the base rate a solar operator receives for the power it sells, and the mainland and Jeju are calculated separately.
REC
Renewable Energy CertificateA certificate proving that electricity was generated from renewables. One REC is issued per MWh generated, multiplied by a weighting set by the type of installation.
RPS
Renewable Portfolio StandardThe obligation on generators above a certain size to supply a set share of their total output from renewable energy.
Renewable energy contract market
계약시장 제도A deployment regime in which long-term purchase contracts are awarded by competitive bidding within a tender volume set by the government. Due to take effect in 2027.
Long-term fixed-price contract
고정가격계약A contract fixing the combined SMP and REC rate for 20 years. It is awarded through competitive bidding and reduces exposure to price movements.
Grid connection
계통연계Connecting the electricity a plant generates to KEPCO's network. It requires spare capacity at the nearby substation and on the distribution line.
Setback distance
이격거리A rule requiring generating equipment to be installed a minimum distance back from housing or roads.
Curtailment
출력제어Forcing a plant to reduce or stop its output to keep the power system stable. It happens when generation exceeds demand.
Development activity permit
개발행위허가The permit a local government issues for altering the form or quality of land, or installing a structure on it. It is the central approval for ground-mount solar.
Electricity business licence
발전사업허가The licence required under the Electricity Business Act to run a generating business. Up to 3 MW it sits with the local government; above that, with the Electricity Regulatory Commission at the Ministry of Trade, Industry and Energy.
BIPV
Building-Integrated PhotovoltaicsPhotovoltaics used as the building material itself — facade, glazing, roof, shading — rather than mounted on top of a finished building.
BAPV
Building-Applied PhotovoltaicsThe conventional approach to solar on buildings: a support structure is fixed to a completed building and modules are mounted on it.
ZEB
Zero Energy BuildingA building that minimizes energy use through high-performance insulation and on-site renewables. Certification runs from grade 1 to grade 5 according to the energy self-sufficiency rate.
ESS
Energy Storage SystemEquipment that stores electricity in batteries so it can be used or sold at the moment it is needed.
VPP
Virtual Power PlantSmall, scattered resources — rooftop solar plants, storage — tied together by communications and software, then operated and traded as if they were a single power plant.
PPA
Power Purchase AgreementA power purchase contract signed directly between an electricity user and a renewable generator. In Korea it takes two forms: direct PPA and third-party PPA.
RE100
An international campaign in which companies commit to sourcing 100% of the electricity they use from renewables. Korea operates its own version, K-RE100.
Green Premium
녹색프리미엄A scheme under which a user pays KEPCO a premium on top of the standard tariff and is recognized as having used renewable electricity.
Self-consumption
자가소비Using the electricity you generate at your own site instead of selling it to the grid. Every unit consumed is a unit off the bill.
Agrivoltaics
영농형 태양광Generating power from an array mounted above farmland while cropping continues underneath.
Repowering
리파워링Replacing the modules, inverters, and other equipment at an aging plant with higher-efficiency products to restore output.
Developer
디벨로퍼The party that finds a site, tests its feasibility, designs the commercial structure, and brings in the construction, financing, and other parties needed to realize the project.
EPC
Engineering, Procurement, ConstructionCarrying out design, procurement, and construction as a single package, or the company that does so.
O&M
Operation & MaintenanceRunning and maintaining a plant after commissioning: monitoring, scheduled inspection, fault response, and settlement management.
Free assessment
It starts with one line: the site address.
Leave the address and a way to reach you. We send back an initial assessment report within about five business days.
Where a project stands up, the report also sets out competitive EPC bids and financing terms.
Available to landowners, building owners, or their authorized representatives · Results come back as a report