Close-up of the cell grid on a backlit solar panel

Process

Seven steps, from assessment to settlement

What we do at each stage, and what you receive at the end of it.

GRIDAEND runs a solar project in seven steps: site intake, a free feasibility assessment, a commercial structure proposal, EPC and equipment selection, financing and support programs, permitting and construction management, and operation, settlement, and expansion.

STEP 01Assessment

Site intake

Same day

What we do

  • We take down the address, the project type, and your contact details.
  • We pull the public records: the cadastral map, the land-use zoning designation, and satellite imagery.
  • If we need anything else from you, we say so at this point.

What you get

Confirmation of receipt, by email or text message

What to have ready

The land parcel number (jibeon) or building address, and a contact number

Note · The more precise the parcel number, the more precise the assessment. If you don't have it, an approximate location is enough to start.

STEP 02Assessment

Free feasibility assessment

Within about five business days

What we do

  • Site and regulations: the land-use zoning designation, the municipal setback ordinance, whether a development activity permit is realistic, and the conversion requirements for farmland or forest land.
  • Grid: spare capacity on nearby substations and distribution lines, and where the grid connection queue stands.
  • Energy yield: simulated from irradiance, orientation, and slope.
  • Revenue structure: a 20-year cash flow under each policy scenario.
  • Funding: which support programs apply, and on what financing terms.

What you get

Initial feasibility assessment report, free of charge

What to have ready

Certified copy of the property register, cadastral map, electricity bills
(None of these are required. They sharpen the numbers.)

Note · Nothing up to this point costs anything, and nothing obliges you to sign. You can read the report and stop there.

STEP 03Assessment

Commercial structure proposal

About one week

What we do

  • We compare 20-year cash flows across three models: roof lease, owner-invested, and investor-funded.
  • We name the structure that fits your situation and show the reasoning.
  • We set out the expected schedule and the procedures involved.

What you get

Commercial structure proposal

What to have ready

Your decision criteria: how much you can invest, the return you are aiming for, how long you intend to hold

Note · We don't pick the structure for you. We show you the numbers; you choose.

STEP 04Execution

EPC and equipment selection

Varies by site

What we do

  • We put the project terms out to our consortium of affiliated and partner EPC contractors.
  • We lay the bids side by side: unit price, contract terms, defect liability warranty, and build time.
  • We settle the specifications for the modules, inverters, mounting structures, and BIPV products.

What you get

Side-by-side comparison of terms, with a recommendation

What to have ready

Tell us if you already have a preferred product or contractor.
We put them in the comparison.

Note · We don't push a particular contractor. The final choice is yours.

STEP 05Execution

Financing and support programs

Runs alongside step 4

What we do

  • We look at how to fund it: facility loans, project finance, leasing.
  • We check which government deployment support programs you qualify for, and when applications open.
  • We calculate how the return moves as the ratio of equity to debt changes.

What you get

Funding plan

What to have ready

Business registration details and financial statements, where financing is involved

Note · Most support programs take applications once a year. Miss the window and you wait another year.

STEP 06Execution

Permitting and construction management

Varies by size and local government

What we do

  • We manage the administrative sequence: electricity business licence → development activity permit → construction plan filing → pre-use inspection → notice of commencement of business.
  • We report on permitting progress at regular intervals.
  • We collect the quality checks carried out by the supervising engineer and the contractor, and report them to you. When something goes wrong, we coordinate between the parties involved.

What you get

Stage-by-stage progress report

What to have ready

Administrative documents such as a registered seal and a power of attorney (we tell you when they are needed)

Note · Permitting takes anywhere from a few months to more than a year, depending on size, location, and grid conditions.

STEP 07Operation

Operation, settlement, and expansion

Ongoing after commissioning

What we do

  • We monitor energy yield and help you respond when something looks wrong.
  • We help with the administration of power sales and settlement.
  • We look at further revenue paths, such as adding an energy storage system (ESS) or joining a virtual power plant (VPP).

What you get

Operating report

What to have ready

Nothing to prepare

Note · Commissioning is not the end. Our job after that is to keep building the value of the asset.

Permits

The permitting sequence

The steps and their order change with the project type, the size, and the local government.
The report tells you which of them apply to your site.
StepWhat it isAuthority
Electricity business licenceLicence to run a generation business under the Electricity Business ActLocal government up to 3 MW; above that, the Electricity Regulatory Commission at the Ministry of Trade, Industry and Energy
Development activity permitPermission to change the form of the land and install structures — the decisive one for ground-mountThe city, county, or district office with jurisdiction
Farmland or forest land conversionPermission or consultation to put farmland or forest to another useThe administrative authority with jurisdiction
Construction plan filingFiled before work starts on the electrical installationThe administrative authority with jurisdiction
Pre-use inspectionInspection confirming the installation was built to standardKorea Electrical Safety Corporation
Notice of commencement of businessNotification that generation has startedThe local government with jurisdiction

Swipe the table sideways to see the rest

The usual administrative sequence for a solar generation project. The detail varies with size and location.

Why we disclose

Why we publish the process first

To compare offers, a project owner first has to know what there is to compare. So we set it out up front: what we check and how, what you receive and when, and what can still move at each stage.
Giving you what you need to judge is the first part of the job.
GRIDAENDFeasibility Assessment ReportNo chargeSITE SUMMARY20-year revenue scenariosOwner-investedRoof leaseWhat we checkSite & regulationGrid connectionEnergy yieldRevenue structureFunding & supportRECOMMENDED STRUCTUREOwner-invested + government supportWhy · operations run mostly by day, so self-consumption paysLow risk

Free assessment

It starts with one line: the site address.

Leave the address and a way to reach you. We send back an initial assessment report within about five business days.
If the site stands up as a project, the report also sets out competitive EPC bids and financing terms.

Available to landowners, building owners, or their authorized representatives · Results come back as a report