Inside a manufacturing plant in the morning light

Network

You deal with one company

Equipment, construction, financing, and operations are each handled by specialist firms. GRIDAEND is the single point of contact: we compare their terms and collect the schedules and inspection results for you.

GRIDAEND works with specialist firms across equipment and manufacturing, construction and EPC, financing and government support programs, and operations and maintenance. It compares their terms and, on your behalf, collects the schedules and inspection results.

Our partners

LS ELECTRIC
Hanwha Systems
Samchully
SKSE
Dabin E&C
ENERDOT
SOLARTEQ
Solarplay
Dasaron
ETA Solar
Dasstech
Korea Green Energy
LS ELECTRIC
Hanwha Systems
Samchully
SKSE
Dabin E&C
ENERDOT
SOLARTEQ
Solarplay
Dasaron
ETA Solar
Dasstech
Korea Green Energy

Construction and O&M partners are appointed project by project.
The company names shown are trademarks of their respective owners, and logos are shown in accordance with each company’s own consent process.

How it works

Asked separately, the answers don't compare

Ask the manufacturer about equipment, the contractor about construction, and the bank about financing, and nothing you get back sits on the same basis.
We put all those terms in one table, so you have something to decide on.
YouLandowners, building owners,and companiesOne channelGRIDAENDAssess · design · manageSingle point of contactEquipmentModules · inverters · BIPVConstruction · EPCPartner consortiumFinance · supportPF · facility loans · grantsOperations · O&MMonitoring · settlementYou deal with one party.GRIDAEND compares the terms and runs the schedule.

Partners

How we work with each field

Equipment · manufacturing

Modules · inverters · BIPV

From standard modules to building-integrated photovoltaics (BIPV) and color or patterned products, we propose a product range that fits the project, together with our partners. We review where the products go, and to what specification, at the early design stage.

Construction · EPC

Engineering · procurement · construction

For each type — ground-mount, rooftop, carport, building-integrated — we work with contractors who have built it before.
The contractor is chosen project by project, by comparing terms.

Financing · support programs

Project finance · facility loans · subsidies

Facility loans, project finance, and government deployment support programs. We design the funding route with you, to bring down what you have to put in up front.

Operations · O&M

Monitoring · settlement · maintenance

After commissioning we monitor energy yield, run the scheduled inspections, and support the administration of power sales and settlement.
The aim is to catch degradation and faults early.

Responsibility

Who is responsible for what

When something goes wrong, it gets fixed faster if the boundaries were clear from the start.
StageGRIDAENDPartner firms
Site assessmentAssess five items — location, grid, energy yield, revenue, financing — and write the report
Commercial structureCompare the roof lease, owner-invested, and investor-funded models, and recommend a structure
Equipment and contractor selectionRequest terms, build the comparison table, recommend oneSupply equipment, submit terms
Financing and support programsBuild the funding plan, check which support programs applyExecute financing, file applications
Permitting and constructionManage the administrative process, track schedule and qualityCarry out the construction
Operations and settlementOperating reports; review of whether to add energy storage (ESS) or a virtual power plant (VPP)Perform O&M

Swipe the table sideways to see the rest

Division of roles · Equipment supply, construction, financing, and operations are performed directly by specialist firms in each field. GRIDAEND assesses the site and designs the commercial structure. It is also the single point of contact, comparing terms and collecting the schedules and inspection results.

Free assessment

It starts with one line: the site address.

Leave the address and a way to reach you. We send back an initial assessment report within about five business days.
If the site stands up as a project, the report also sets out competitive EPC bids and financing terms.

Available to landowners, building owners, or their authorized representatives · Results come back as a report